13 Jul 2026CMMC Phase II suspended: no C3PAO assessments can be designated. DFARS 7012 and Rev 2 still apply.What changed, and what did not

Free · no sign-in · sources on the page

What will CMMC cost you?

What a result proves: which part of the cost is DoD's (the assessment), which part is yours (the gap), and what a deliberately small boundary changes. Not a quote; a quote follows a verified readiness assessment.

What does your contract require?
Business size
How much of NIST 800-171 is in place today?

Not sure? Mark the 110 in the calculator and this page will use your marks.

Two details

Three-year estimate · Level 2 self-assessment

$99,100 to $193,990

doing the remediation with your own staff, plus the assessment DoD priced

Assessment and affirmations, DoD's estimate
$37,196
Verbatim from the CMMC Program final rule, 89 FR 83178 (Tables 9 and 10)
Closing 40 open requirements
$61,904 to $156,794
578 to 1,464 hours at $107/h. MacTech's assumption, not DoD's: 24 to 60 hours per 5-point requirement, 16 to 40 per 3-point, 6 to 16 per 1-point, priced at the rule's own labor rates. DoD did not estimate this cost at all.
The same three years with a MacTech enclave
$151,653 to $175,429
The managed vault carries 31 of your open requirements in the technical families; 9 policy and people requirements still take hours. Packages at today's catalog prices, 2026-09-19.

Email me the line-item breakdown

Every line: the rule's plan, conduct, report and affirmation figures with their page numbers, the hours and rates behind the remediation range, the enclave path package by package, and the assumptions, as a table and a CSV.

We recompute the estimate on our side from your answers; nothing else is sent. No sales sequence; MacZine only if you tick the box.

Sources: CMMC Program final rule, 32 CFR part 170, 89 FR 83092 (15 October 2024), 89 FR 83178 (Tables 9 and 10) and 89 FR 83180 (Tables 12 and 13). The rule states that implementing FAR 52.204-21 and NIST SP 800-171 is “already required” and “not accounted for in this cost estimate” (89 FR 83179); the DFARS interim rule, 85 FR 61505 at 61514 (29 September 2020) made the same assumption. Everything above the assessment figure is MacTech's model.

What the numbers rest on

How much does CMMC Level 2 certification cost?
DoD's own estimate in the CMMC Program final rule is $104,670 over three years for a small entity and $117,768 for other than small (89 FR 83178 (Tables 9 and 10)), covering planning, the assessment itself including the C3PAO fee, reporting and three annual affirmations. That figure deliberately excludes the cost of implementing NIST SP 800-171, which the rule treats as an existing DFARS 252.204-7012 obligation; the estimator above adds that part from your own open requirements.
How much does a Level 2 self-assessment cost?
$37,196 over three years for a small entity and $48,827 for other than small, per the same tables. Since the suspension of CMMC Phase II on 13 July 2026, the self-assessment is the Level 2 path contracting officers can require today.
Why do other CMMC cost calculators ask for my email before showing a number?
Because the number is the thing they are selling. Ours shows the range on the page and emails the line items, the hours, the rates and the sources; you can check every figure against the Federal Register.
Is a CUI enclave cheaper than treating the whole company as in scope?
Usually, and the estimator shows why rather than asserting a percentage: a managed enclave carries the technical control families (access, audit, configuration, identification, media, communications and integrity protection) as inherited or system-enforced controls, so the hours you still spend are on the policy and people requirements. The enclave path prices MacTech's packages at today's catalog prices beside the in-house path so you can compare like with like.

Primary source: CMMC Program final rule, 32 CFR part 170, 89 FR 83092 (15 October 2024). The assessment tables are at 89 FR 83178 (Tables 9 and 10); the labor rates at 89 FR 83180 (Tables 12 and 13); the exclusion of implementation cost at 89 FR 83179.

From MacZine

Working notes on what it costs

The full run →