13 Jul 2026CMMC Phase II suspended: no C3PAO assessments can be designated. DFARS 7012 and Rev 2 still apply.What changed, and what did not

NIST SP 800-171 Rev 2 · 3.7 Maintenance

3.7.2 Control maintenance tools

Provide controls on the tools, techniques, mechanisms, and personnel used to conduct system maintenance.
SPRS weight
5
5 points deducted from 110 when not implemented.
CMMC level
L2
Level 2 only; not among the 17 Level 1 practices.
Assessment objectives
4
From NIST SP 800-171A, each one a “determine if” an assessor answers.

What an assessor checks

NIST SP 800-171A breaks 3.7.2 into 4 objectives. Every one has to be met for the requirement to be met; a partial answer scores as not implemented.

  1. [a]Determine if tools used to conduct system maintenance are controlled.
  2. [b]Determine if techniques used to conduct system maintenance are controlled.
  3. [c]Determine if mechanisms used to conduct system maintenance are controlled.
  4. [d]Determine if personnel used to conduct system maintenance are controlled.
Examine
[SELECT FROM: System maintenance policy; procedures addressing system maintenance tools and media; maintenance records; system maintenance tools and associated documentation; maintenance tool inspection records; security plan; other relevant documents or records].
Interview
[SELECT FROM: Personnel with system maintenance responsibilities; personnel with information security responsibilities].
Test
[SELECT FROM: Organizational processes for approving, controlling, and monitoring maintenance tools; mechanisms supporting or implementing approval, control, and monitoring of maintenance tools; organizational processes for inspecting maintenance tools; mechanisms supporting or implementing inspection of maintenance tools; organizational process for inspecting media for malicious code; mechanisms supporting or implementing inspection of media used for maintenance].

If it is open: POA&M eligibility

Not POA&M-eligible: above the 1-point ceiling · 5 points deducted

Worth 5 points. No requirement over 1 point may appear on a Level 2 POA&M, so this has to be closed before the assessment.

A POA&M is only permitted at a score of 88 or above, and closes in one 180-day window. Check a full gap list or compute your score.

Where 3.7.2 maps

NIST SP 800-53 Rev 5

  • MA-3 Maintenance Tools

NIST CSF 2.0

  • Maintenance is performed Maintenance

SOC 2

No direct mapping.

Query it from your own tools

This page and the MacTech CMMC MCP server render the same dataset. Ask your assistant and it will answer from the methodology, not from memory.

lookup_control 3.7.2
get_assessment_objectives 3.7.2
generate_poam_entries ["3.7.2"]

Install the MCP server, free, no account.

From MacZine

Working notes on Maintenance

The full run →