MacZine
The MacTech Solutions Newsletter
Topic · 3 articles
Topic · 3 articles
POAM
Every MacZine article on POAM, newest first - written, reviewed and versioned in the open.
075Issue Nº
The CMMC Review Found the Cost Is the Controls, Not the Certificate
DoD's own summary of CMMC reform comments puts the cost in NIST 800-171, not certification. What the task force options change for a small contractor.
067Issue Nº
Physical Access Is 13 SPRS Points No Small Shop Can Put on a POA&M
NIST 800-171 physical protection, 3.10.1 to 3.10.5, carries 13 SPRS points and none can wait on a POA&M. A walk through a small shop, door by door.
023Issue Nº
What You Can Put on a POA&M, and What You Cannot
Under 32 CFR 170.21 a CMMC POA&M can carry only 1-point requirements, minus six named exclusions, and must close within 180 days. The rules.